Home/Industries/Construction and property
Industries

The estimate is the product. Most of them are never followed up.

Every project starts as a number in a document, and the difference between a good year and a bad one is what happens in the two weeks after it is sent. Almost nobody systemises that fortnight.

Thirty minutes · no predetermined package

Six estimates out
and the crew is booked to July
$1.84mquoted this month
ProjectValueSentState
Halverson — kitchen$84k14 daysno answer
Ridgeway — roof replace$62k9 daysaccepted
Bexley — commercial fit$610k21 daysrevised x3
Okafor — extension$148k31 daysgone quiet
Almeida — bath remodel$41k6 daysaccepted
Nakamura — deck$28k2 dayssent
2 accepted, 3 waiting, 1 lostnobody followed up after day seven
7
Day seven is where estimates die
and nothing in the process notices
Symptoms

What an unmanaged estimate pipeline feels like.

01

An estimate goes out and nothing happens until the client calls, which is usually never.

02

Three revisions exist for the same project and nobody can say which was sent.

03

Crew capacity is in someone's head, so jobs get sold into weeks that are already full.

04

Change orders are agreed verbally on site and invoiced hopefully.

05

Subcontractor availability is discovered by phoning around when the job is already scheduled.

06

Margin per job is calculated at year end, which is far too late to change anything.

The ground truth

What you are probably running, and what constrains it.

The typical stack

Buildertrend, CoConstruct or Procoreproject management, starting after the job is won
A spreadsheet or takeoff toolestimating, disconnected from the pipeline
QuickBooksaccounting, reconciled against job costs by hand
A shared calendarcrew scheduling, in practice
Text messagessubcontractor coordination, in practice

What the rules require

Contractor licensing varies by state and municipality and constrains who may bid and perform what work.
Permit requirements attach to job type and jurisdiction, and a missing one stops work rather than delaying it.
Lien rights carry notice deadlines that start on events the system should record rather than someone remember.
Consumer contract rules including cooling-off periods apply to residential work in most states.
Evaluation

Six questions before changing anything.

01What happens to an estimate on day seven?In most businesses, nothing. That is where the revenue is.
02Which revision did the client actually receive?Three versions of a number is three different jobs.
03Is crew capacity a system fact or a conversation?Selling into a full week costs more than losing the job would have.
04How are change orders captured?Verbally on site is the norm and unbilled work is the result.
05Do you know margin per job before the job ends?Year-end margin is a post-mortem, not a control.
06How do you know a permit or a licence blocks a start?Usually the morning the crew arrives.
How the work arrives

How a project actually arrives.

01

Enquiry

referral or search

Homeowner or GC, usually comparing two or three contractors on responsiveness before price.

02

Site visit and takeoff

the estimate

Measurement, scope and pricing — the deliverable that decides everything downstream.

03

The follow-up fortnight

where jobs are won

Two weeks of silence loses more work than price does, and almost nobody systemises it.

04

Scheduling

against real capacity

Crew, subs and permits, which are three different constraints treated as one.

05

Change orders and close

margin, finally

Agreed in writing, billed on time, and reconciled while it can still change something.

Questions

What contractors ask.

What should a CRM for construction do that project management does not?

Handle everything before the job is won — the enquiry, the estimate, the revisions and the follow-up. Buildertrend and Procore begin after the contract, which is after the risk.

Why do estimates go cold?

Because nothing follows them up. Most contractors send a number and wait, and the client chooses whoever stayed in touch rather than whoever was cheapest.

How should estimate revisions be handled?

As versions of one record with a clear sent state, so there is never ambiguity about which number the client is holding.

Can crew capacity be part of the sales process?

It should be. Selling into a week that is already full is more expensive than declining the work, and only a system can see it in time.

How do change orders get captured properly?

In writing, against the job, from the site — usually on a phone. Verbal agreement is how contractors fund other people's projects.

Does this integrate with Buildertrend or Procore?

Yes. The usual pattern is the project system keeping the job and the CRM keeping everything before it, with the handover happening on acceptance.

How do you track margin per job in time to act?

By costing against the estimate as the job runs rather than reconciling at the end, which requires the estimate and the accounting to share a structure.

What about licensing and permits?

Both constrain who can work where, and both should be facts the system checks rather than things a scheduler remembers.

What does a project like this cost?

It scales with integration count — estimating, project management, accounting — rather than with crew size.

What we build here

The capabilities this sector uses most.

C
Custom CRM development
the estimate and the fortnight after it
L
Lead management and routing
responsiveness, which wins the bid
D
Data and reporting
margin per job, while it matters