Home/What we solve/Our CRM doesn't fit how we work
What we solve

The CRM is not the problem. The process nobody wrote down is.

Businesses replace a CRM when the real problem is that the process it was configured for was never agreed. The second platform gets configured around the same unexamined assumptions, at greater cost, and the complaints come back inside a year.

Thirty minutes · no predetermined package

Field usage, last 90 days
what the team actually fills in
LIVE
01Lead sourcerequired at createin use94%
02Qualification notesfree text, no rulevaries31%
03Next step datedrives the pipeline reportempty12%
04Proposal senta stage nothing leavesstuck41 deals
05Loss reasona picklist of nineempty6%
06Decision makeradded by an admin in 2023unused0%
6 of 41 fields carry the pipelinethree of the six are empty
41
Forty-one fields, six that matter
and three of those are empty
Overview

A platform complaint is usually a process complaint with a product name on it.

Almost every business that wants to replace its CRM can name what is wrong with it. Very few can produce the process the system was meant to encode, because it was never written down — so the configuration reflects a series of individual guesses made by whoever was in the tool that week.

Replacing the platform carries those guesses across. The migration is real work, the invoice is real, and a year later the same people are keeping the same spreadsheet next to the new system for the same reason.

Symptoms

What this looks like from inside the business.

01

The same information is typed into two or three systems by different people.

02

Critical steps run on a spreadsheet one person maintains and nobody else understands.

03

The CRM was implemented by a vendor and is now used as a contact list.

04

Stages exist that nothing ever moves out of, and everyone knows which ones.

05

New hires learn the process by shadowing, because it is not written down anywhere.

06

Reports have to be assembled by hand before anyone will trust them.

Root causes

Four mechanisms, and none of them is the software.

01

The process was never mapped

Configuration decisions get made in a vacuum by whoever is in the tool that week. Six months later the object model reflects a series of individual guesses rather than a design anyone agreed to.

02

No system of record was chosen

When two systems both hold customers, both are authoritative and neither is. Every downstream report has to reconcile them, which is why reporting takes days and still gets argued about.

03

The uncovered fifth is where you differ

Platforms cover the common four fifths well. The remainder is usually what makes the business competitive, and it ends up in spreadsheets because nobody built for it.

04

Nothing was documented

An undocumented system is a single point of failure with a notice period. Businesses discover this at the worst possible moment.

What we evaluate

Six questions before changing anything.

01What path does a job actually take, from enquiry to paid?Drawn with the people who do it, including the steps that only work because someone specific is doing them.
02Which system wins when two disagree about a customer?If the answer is that it depends who you ask, that is the finding.
03Which spreadsheets are load-bearing?What is in them tells you precisely what the CRM cannot hold.
04Which steps depend on one person’s knowledge?Rather than on a written rule. That list is the handover risk, priced.
05What does the object model imply about the process?Set against the process the business actually runs. The gap is the work.
06What integration exists, and what silently fails?Most integrated stacks have one direction working and the other quietly off.
Example solution architecture

One record, and everything else reading from it.

The direction of the arrows is the decision. Which system wins is agreed before anything is configured, because every report downstream inherits that answer.

Target shape
agreed on a whiteboard before anything is configured
TARGET
SURFACE
Website and formswhere it starts
Client portalstatus without an email
Internal applicationthe part nothing covers
Field and mobilethe same record
SYSTEM OF RECORD
Customer objectone, authoritative
Job or deal objectthe unit of work
Documents and e-signattached, not emailed
Audit trailwho changed what
AUTOMATION
Stage transitionsrules, not reminders
Task generationwork that appears
Notificationsto a person, once
Document workflowgenerated from the record
INTEGRATION
Accountingreads, never writes
Scheduling and dispatchone calendar
Marketing platformssource survives
Reporting warehousedownstream of all of it
configuration evaluated first · one system of recorddocumentation is part of the build
Relevant work

Where this has already been built.

The platform this describes, running

Lead routing, partner ingest and attribution in production — the same shape, built for an operation that had outgrown three tools.

See what we've built

Why customising a CRM is not a warning sign

The argument that off-the-shelf configuration is safer than a build, and the specific cases where it stops being true.

Read

Configuration first, every time

What we do in the first two weeks, and the point at which we would tell you the platform is genuinely the problem.

How we work
Questions

What teams ask before they start.

Do we need to replace our CRM?

Usually not, and we would rather tell you that than sell you a migration. A large share of CRM complaints are configuration and process complaints attached to a product name. We evaluate what you own before proposing anything you do not, and if the platform genuinely cannot do the job we will show you the specific requirement it fails.

How long does the mapping take?

A week or two of elapsed time for most operations, and a few hours each from the people who do the work. It is deliberately front-loaded: everything after it is cheaper when the process is written down, and the map is yours whether or not we build anything.

How do you avoid building something nobody uses?

By writing the process down with the people who will use it before anything is configured, and by shipping in phases that each get used before the next one starts. If a phase is not being used, that is the signal to stop and find out why rather than to build the next thing on top of it.

Who owns the system afterwards?

You do — the accounts, the data, the code and the documentation. Engagements are structured so that ending one is a decision rather than a risk, which means the documentation is part of the build and not an afterthought.

What if the answer really is a custom build?

Then we say so, and we show you the requirement that led there rather than asserting it. A build is a larger commitment and it should be entered with the specific reason written down, so that in two years somebody can check whether the reason still holds.

Describe what your team works around.

The workaround names the constraint. Tell us what sits in the spreadsheet and we will tell you what we would look at first — and whether it is even a job for us.

First conversation
Thirty minutes, with the person who would run it
What you get
A first read on what usually sits behind it
Cost
None, and no proposal unless you ask for one
If we are wrong for it
We say so in the first call